4th Street SE

Project Data

  • Project Number: County Road Project (CRP) 983
  • Project Length: 1,136 Lineal Feet
  • Construction Start: Summer 2020
  • Last Updated: November 18, 2020

For more information on this project contact Douglas County Transportation at 509-884-7173.

Vicinity Map

View the 4th Street SE Project Vicinity Map (PNG)

Project Description

The proposed project would include reconstructing 1,136 linear feet of roadway from S Lyle Avenue to S Mary Avenue, and includes:

  • Roadway section will receive an overlay of hot mix asphalt over crushed surfacing and will increase the curb-to-curb width to 34 feet.
  • Curb, gutter, and 5-foot wide sidewalk will be installed along the length of the corridor
  • New sidewalks will connect with rapidly developing peripheral residential areas to existing pedestrian infrastructure adjacent to Clovis Point Intermediate School
  • All deficient curb ramps and driveway entrances will be improved or replaced to meet the American with Disabilities Act requirements
  • Illumination will be added at the entrance to the school and major intersections and striping and signage upgraded to improve pedestrian and driver safety
  • An existing gabion basket retaining wall east of the school will be removed and replaced with a retaining wall constructed at a more appropriate distance from the roadway to allow for continuation of the existing sidewalk and improve clear-zone safety

Project Status

Construction is complete and the road is open to the public. Illumination work continues and is scheduled for completion in December. Thank you for your patience during the construction project.

Call For Bids

Addendums

Plan Holders

Note

In order to be placed on the plan holders list and enable us to forward addendums to you, after downloading plan documents please email Carol Hardie with your:

  • Company Name
  • Address
  • Phone Number
  • Fax Number
  • Email (if different than sending email)
  • Contact Person's Name